www.chinaservicesinfo.com

News and Policies

Xinjiang Oilfield marks 70 years of operation

Updated: Apr 23, 2025 China Daily Print
Share - WeChat
Workers approach an oil well in the Cainan Operation Area on April 6. LYU DIANJIE/YANG CHUYI/FOR CHINA DAILY

They are optimizing development plans using big data, conducting core experiments at well sites in the eighth area to provide crucial data for the development of 55 wells in old areas. Grassroots production teams are stationed at old wells to accelerate new well yield, and the logistics department is strengthening material allocation and equipment maintenance to enhance production efficiency.

At noon, patrol team leader Zhang Lei and his team inspected the photovoltaic panel array. The panels coexisting with the endless red oil wells symbolize the oilfield's transition toward green practices. The installed solar capacity in the Xinjiang Oilfield has reached 200,000 kilowatts, with the annual power generation meeting 15 percent of production needs.

< 1 2 3 4 5 6 7 8 9 >

Copyright©2025 China Daily. All rights reserved.

京ICP备13028878号-6

京公网安 京公网安备 11010502032503号